Over-dimensional cargo
ODC & Heavy Equipment
Trailers, low-beds and route surveys for cargo that will not fit a standard truck.

Plant machinery, structural steel, tanks and project equipment moved with the right trailer, the right permits and a surveyed route.
Key benefits
- Low-bed, semi-low-bed and multi-axle trailers
- Route survey and height/width clearance planning
- State permits and escort coordination
- Lashing, chocking and secure load plans
How it works
- 01
Cargo assessment
Dimensions, weight and lifting arrangement reviewed with drawings.
- 02
Route survey
Bridges, overheads and turning radii checked end to end.
- 03
Permits
State-wise ODC permits and escorts arranged before dispatch.
- 04
Movement
Supervised loading, day-wise movement plan and delivery confirmation.
Industries we serve with this
FAQs
Do you handle loading and cranes?
We coordinate cranes and lashing at both ends when required.
How long do ODC permits take?
Usually 3–7 working days depending on the states involved.
Need reliable freight?
Let’s move your cargo.
Share your lane and load. Our team responds with a written rate within two hours on working days.
